Brealey Drive Is Now Open

Good news: After months of detours, construction has been completed on Brealey Dr., and the road is now open between Lansdowne St. and the Fleming Parkway.

Photo via @FlemingCollege

Photo via @FlemingCollege

There are new turning lanes and traffic lights at the entrance to the college, along with new signalized pedestrian crosswalks and new sidewalks/walking paths.

Engage with us on social media on TwitterInstagram and FacebookWrite to us at tips@ptbocanada.com.