Traffic control measures and detour routes will be in place for the duration of the work.
At this time, selected grating panels of the metal bridge deck will be removed, repaired and reattached to the bridge to reduce the noise caused by vehicles using the bridge. Following an observation period during the summer months, similar work may be completed on the remaining grating panels in the fall.
The repair work will not impact navigation along the waterway.