Significant Rainfall Causes Temporary Partial Bypass at the Wastewater Treatment Plant

UPDATE: The temporary partial bypass is over as of 3:25 p.m. Anyone using water from the Otonabee river downstream of the City of Peterborough Wasterwater Treatment Plant should exercise caution for the next 24 hours.

The City of Peterborough issued a statement saying significant rainfall has caused a temporary partial bypass at the Wastewater Treatment Plant, on Thursday.

Photo courtesy of the City of Peterborough.

Photo courtesy of the City of Peterborough.

Rainfall on Wednesday and Thursday has caused a significantly increased volume of water to enter the Wastewater Treatment Plant. As a result of the current conditions, the City of Peterborough Wastewater Treatment Plant has had to start a temporary, partial bypass.

This means that some partially treated sewage is being discharged to the Otonabee River.

Residents downstream of the City of Peterborough who draw water from the river are advised to take necessary precautions and boil water. The boil water advisory does not affect the City of Peterborough.

The City of Peterborough asks residents to reduce water consumption to help alleviate the volume of water flowing through the City’s Wastewater Treatment Plant. Residents can reduce their water consumption by taking short showers instead of baths, limiting or delaying loads of laundry and turning off taps while brushing teeth and doing dishes.

Engage with us on social media on Twitter, Instagram and Facebook. Write to us at tips@ptbocanada.com. Sign up for PTBOBuzz newsletter here.