Parks Canada to Complete Annual Maintenance On Maria Street and Parkhill Road Bridges In April

Parks Canada will complete annual spring maintenance on two bridges in Peterborough on Sunday and April 20, announced on Friday.

Photo by David Tuan Bui.

These bridges include:

  • Maria Street bridge: Sunday from 6 a.m. to noon

  • Parkhill Road swing bridge: April 20 from 6 a.m. to noon

The bridges will be temporarily closed to all traffic while maintenance is underway. Detour routes will be posted.

Peterborough Transit Route 7 Lansdowne will detour around the Maria Street bridge during the closure, using the Lift Lock tunnel on Sunday. Drivers are asked to use the stop at Hunter and Rogers streets.

Engage with us on social media on Twitter, Instagram, Facebook, Tiktok, Youtube and LinkedIn. Write to us at tips@ptbocanada.com. Sign up for our newsletter here.